Data Center Moving Checklists : 54 pages : 2011 by Alacrity Services
IA series of
detailed checklists to ensure that the integrity of the physical
equipment and key data are maintained during any major physical data
center operations. Topics included; Un-archivable databases,
managing complex power distribution systems, securing complex
wiring...
Hard
Cover $500.00
Conflict Zone Data Center
Operations : 136 pages : 2010 by G.A. Henderson
Case studies
of data center operations in international conflict zones. Topics
include; sensitive data exposure, physical plant security, vetting
foreign machine room personnel, keeping ahead of changing legal
structures, etc. c
Hard
Cover $1,400.00
Rack Cooling Strategies: 49 pages by Alacrity Services
A detailed review of various rack, room,
and location based cooling strategies. Also includes a
thorough examination of how system architectures contribute to
cooling challenges. Tables compare BTU outputs from popular server
models.
Hard
Cover $500.00
Large Data Center Relocation Planning : 124 pages by G.A. Henderson
Step by step
analysis of the challenges of a large data center move.
Provides details, and discussion of alternative approaches, of
current best practices at each phase of operations from planning to
post reconciliation procedures..
Extensive case study of 400 enclosure
vertical relocation. Includes stakeholder checklists,
pre,-operational, operational, and post-operational guidelines and
checklists. Also includes complete OSHA approved crew guidelines.
Hard
Cover $900.00
Rigging Rack Enclosures & other sensitive equipment: 125
pages by G.A. Henderson
Contents: Step by step guides to
evaluating potential rigging projects from a structural engineering
standpoint. How to guides on building and sourcing key rigging
components Also includes detailed safety procedures and key
set points for recovery from failures.
Hard
Cover $1,200.00
Physical Data Center Security : 85 pages by G.A. Henderson
Reviews of internal and external threat
assessments, and best practices for risk management and
minimization. Case studies of the most dangerous situation an
solutions.
Hard
Cover $800.00
10 Tragic Mistakes in Data Center Relocations : 71 pages by Alacrity Services
Detailed summary and checklists for
tragic structural failures including elevators and raised flooring.
Also includes stakeholder management issues. Based upon over
15 years of large data center relocations experience.
Hard
Cover $700.00
Order Delivery Details
Contact Name
Title
Company/Organization:
Department
Email Address
Alternative Email:
Contact Telephone
Extension:
Referred by
SKYPE number:
Country:
Postal code:
Address 1:
Address 2:
City:
State:
Order Billing Details
Purchase Order:
P.O authorization contact
person & phone
Credit Card Info:
Order Total
Credit Card Type:
Credit
Card Number:
Expires:
CCV:
Cardholder
Information:
Name on Card:
Telephone:
Address information if
different from above.
Address1:
Address2:
Country:
City:
State:
Postal Code:
Notes: Shipping costs &
schedules: Many of these volumes are available for immediate
delivery via PDF. For titles not available for immediate delivery,
please expect 1-2 weeks before shipment. You will be notified with
tracking information when your titles ship. Shipping within the US
is free. International shipping will be charged directly by the
shipper (usually DHL).
If you purchase any Alacrity service within 12 months of purchasing
a case study, up to $500, will be deducted from your order total.
Thank you for your order.
Please enter the current year
as a anti-spam check:
Alacrity
Engineering Services
Alacrity
Technology relocation services
New York, London, Philadelphia,
Paris, San Francisco, Chicago, Atlanta, Doha, Cleveland, Washington
DC, Houston, Cairo, Miami, Los Angeles
US & Canada 703-825-7129
International 571-281-4387
Short
notice, ultra fast... data center equipment and capability
relocations.